Factors that influence the price of your Project

When determining the price of a construction project—whether a storied (multi-storey) building or a bungalow (single-storey)—several key factors come into play. Here’s a breakdown of the most influential ones

Type of Structure

Storied Building: Higher cost due to columns, beams, staircases, slabs, and possibly elevators. Requires deeper foundations and stronger structural elements.

Bungalow: Generally lower structural costs, but may require a larger plot of land for the same floor area..

Plot Size and Shape

Larger plots require more excavation and filling.

Irregularly shaped plots may increase design and construction complexity

Foundation Type

Multi-storey buildings often need deep foundations (raft or piles), which are costlier.

Bungalows may use shallow foundations (strip or pad footing), which are cheaper

Floor Area / Square Footage

The total size of the project has a direct impact on cost.

Cost per square meter may reduce slightly as size increases due to economies of scale.

Construction Materials

Choice between standard vs. premium materials (flooring, roofing, fixtures).

Type of walling (blocks vs. bricks), roofing (tiles vs. iron sheets), windows (aluminum vs. UPVC), etc

Labor Costs

Depend on location, availability of skilled workers, and project duration.

Storied structures often require more skilled labor (reinforcement work, formwork, scaffolding).

Structural Design & Engineering

Complex structural designs for multi-storey buildings increase engineering and supervision costs.

Simpler bungalows cost less in terms of design fees.

Site Conditions

Water-logged or rocky sites demand special construction techniques or equipment.

Accessibility of the site affects material transport and labor logistics.

Services and Finishes

Plumbing, electrical, HVAC, and smart home systems.

Interior finishes: tiling, cabinetry, ceilings, paint, lighting.

Permits & Regulatory Costs

Building permits, inspections, and approvals may vary by location and type of structure.

Timeframe

Urgent projects cost more due to fast-tracked labor and resource mobilization.

Comments
  • Aute mi ut suspendisse velit leo, vel risus ac. Amet dui dignissim fermentum malesuada auctor volutpat, vestibulum ipsum nulla.

    • Sed reprehenderit quam, non felis, erat cum a, gravida lorem a. Ultricies in pellentesque ipsum arcu ipsum ridiculus velit magna, ut a elit est. Ultricies metus arcu sed massa. Massa suspendisse lorem turpis ac.

  • Massa suspendisse lorem turpis ac. Pellentesque volutpat faucibus pellentesque velit in, leo odio molestie, magnis vitae condimentum.

Leave a Reply to Vincent Adams Cancel reply

Your email address will not be published. Required fields are marked *

Contact Us

Give us a call or fill in the form below and we will contact you. We endeavor to answer all inquiries within 24 hours on business days.